Temporary doesn’t mean exempt: planning permission for marquees and structures in the UK
May 14, 2026
By Claire Rooney

It is a common assumption but also a misleading one that planning permission for marquees and structures does not apply.

In reality, UK planning rules do not work like that.

Whether a structure is permanent or temporary is only part of the picture. What matters more is how it is used, where it is located, and the impact it has on the surrounding site and environment.

If you are considering installing a temporary structure, understanding where you stand on planning permission early can help you avoid delays, unexpected costs and disruption to your project.

Why “temporary” does not automatically mean exempt

In planning terms, a marquee or temporary building is still considered development if it changes how land is used or has a material impact on its surroundings.

That means:

  • A structure that is in place for a short period can still require planning permission
  • A demountable or relocatable building is not automatically exempt
  • Planning decisions are based on impact, not just permanence

This is where many projects run into difficulty, particularly when timelines are tight and assumptions are made too early. 

The 28-day rule: useful, but often misunderstood

You may have come across the “28-day rule”, which allows land to be used for a temporary purpose for up to 28 days in a calendar year without full planning permission.

This can apply to scenarios such as:

  • Outdoor events
  • Temporary storage
  • Seasonal use

However, there are some important limitations:

  • The 28 days are cumulative across the year, not per use
  • It applies to the use of land, not just the structure itself
  • It does not override other controls such as licensing, highways or environmental restrictions

In practice, many commercial or operational requirements exceed this threshold, meaning planning permission becomes necessary.

When planning permission is likely to be required

While every project is assessed individually, there are some common triggers that mean permission will usually be needed.

These include:

Duration

  • The structure will remain in place for more than 28 days

Size and footprint

  • The building has a large floor area (often over 100m² as a general guide) 
  • It occupies a significant proportion of the site

Position on site

  • Located close to site boundaries (for example within around 5 metres) 
  • Likely to affect neighbouring properties

Height and visual impact

  • Taller than surrounding structures
  • Alters the overall appearance of the site

Operational impact

  • Affects traffic flow, access routes or parking arrangements 

Individually, these factors may not always trigger a requirement, but taken together, they form the basis of how planning authorities assess a proposal.

When you might not need planning permission

There are situations where planning permission may not be required, often linked to Permitted Development (PD) rights.

These typically apply where a structure:

  • Supports an existing use on the site
  • Falls within defined size and positioning limits
  • Does not significantly alter the external appearance or function of the site

However, PD rights are highly site-specific.

They can vary depending on:

  • The type of property (commercial, educational, agricultural, etc.)
  • Previous development on the site
  • Local planning restrictions

In some cases, PD rights may have been removed entirely.

Because of this, it is always worth verifying your position before proceeding.

Why location changes everything

Planning sensitivity increases significantly depending on where your site is located.

Additional restrictions are common if your project is:

  • Within a conservation area
  • Close to or affecting a listed building
  • Located in the Green Belt
  • Impacting land with protected trees or subject to Tree Preservation Orders (TPOs) 

In these environments, even relatively small or short-term structures can require more detailed assessment.

Temporary permission vs permanent development

One advantage of temporary structures is that planning authorities may be more flexible in granting temporary permission than they would be for a permanent building.

This is often the case for:

  • Construction and infrastructure projects
  • Short-term operational requirements
  • Interim solutions during redevelopment

Because the structure can be removed, planners may view it as a lower-risk option making it a practical route to unlocking space where permanent development would not be approved.

What to expect from the planning process

If planning permission is required, the process is relatively straightforward in most cases.

  • Typical decision timeframe is around 8 weeks
  • Applications are assessed by your Local Planning Authority (LPA)
  • Decisions are based on local planning policy and material considerations

It is also worth noting:

  • Objections do not automatically prevent approval
  • They must be based on valid planning concerns such as noise, traffic or visual impact 

Early engagement and a well-prepared application can significantly improve the likelihood of a smooth outcome.

A note on retrospective planning

In some cases, it is possible to apply for retrospective planning permission after a structure has been installed.

This is typically used in urgent situations, such as emergency response or disaster recovery 

However, it is not without risk:

  • Approval is not guaranteed
  • You may be required to remove the structure if permission is refused

For that reason, it is generally better to address planning requirements upfront wherever possible.

The most important takeaway: every site is different

While general rules and thresholds are helpful, there is no universal answer to whether planning permission is required.

Each project depends on:

  • The structure itself
  • How it will be used
  • The characteristics of the site
  • The policies of the local authority

Taking advice early (before installation) can help avoid delays, protect budgets and ensure your project runs as planned.

Final thought

Temporary structures are often chosen because they offer speed, flexibility and minimal disruption.

But from a planning perspective, they still need to be approached with the same level of care as any other development.

Getting clarity at the outset makes the rest of the project significantly easier.

Please reach out if you’d like to discuss your project in more detail and to find a suitable temporary structure for your needs.

Chat with me Jamie
Have Questions?
If you’d like to discuss your requirements, click the link below
get in touch
Only Takes 5min!
Online Calculator
Try Our Online Marquee Structures Calculator - Get instant price estimates tailored to your needs
LET’S CALCULATE
Construction
Extra space for exam season and beyond
Construction
Temporary space planning: 6 essential things to consider before you need it
Construction
The pros and cons of hiring vs buying a marquee
Don’t Just Take Our Word for It

Like international rescue
You’re like international rescue, all professional and more importantly, there when need. Highly recommend this company.

Brand Tudgay
The Bespoke Furniture Company

Fantastic support to us
Trafalgar Structures have been a fantastic support to us since we reopened after lockdown. The provision of a high quality marquee to help facilitate our opening strategy meant we could cater for adult and child classes whilst following the required government guidance. The service and workmanship from the team was first class and the team were always happy to help out if any issues arose and amendments to the marquee were needed. I look forward to working with the team again and would fully recommend for any marquee needs

Leigh Johnson
General Manager, David Lloyd Clubs

The Lid on the Lawn
‘The Lid on the Lawn’ installed by Trafalgar Structures enabled us to reopen safely after the July 2021 easing of the government guidelines, within 10 days we had a fully operational table service outdoor restaurant. Such has been the successful transformation of the outside space, we have kept the marquee for a longer term hire. The demand for outdoor dining and eventing has increased exponentially and the marquee has enabled us to confidentially offer weather proof ‘outdoor events’. This is now a permanent fixture with an additional full takeaway facility for visitors to the estate. Team Trafalgar are always on hand and have also reacted extremely quickly to the last minute nature of corporate event enquiries. Many thanks.

Jeannette Simpson
COO, Denbies Wine Estate LTD

I cannot find fault in anything they did

We used Trafalgar Structures at the start of lock down. We were very fortunate to be able to remain fully working however, as everyone did, we had to make some major adaptions on our site to accommodate the 2m distancing. I came across Trafalgar Structures and I found them to be extremely helpful, knowledgeable and helpful. We had constant changes to the brief but that didn’t matter to James and his team, they were very accommodating and continued to be very helpful and help fulfil the works we required as well as give a lot of suggestions to make this work. The team that erected/ dismantled the marquee were extremely professional and friendly and helpful throughout the 2 days. I would highly recommend Trafalgar Structures and I would certainly use them again. I cannot find fault in anything they did. Thank you all so much for your help and guidance

Logistics Manager
Clipfine Limited

Trafalgar Structures came to the rescue when the school needed additional outdoor teaching and testing facilities during the Covid pandemic. The cost of hire was extremely competitive and more than reasonable, particularly when you consider their services are much in demand. From the MD to the installers on the ground they were easy to deal with – nothing was too much trouble. Even last minute changes, and their after sales service was just as good. Its not every day you hire a marquee, but if I have to in the future, Trafalgar will be my first port of call. A huge thank you to James and the team!

Neil Lowe
Lady Eleanor Holles school